08-07-2009, 12:48 PM | #36 | |
put it THIS way
Join Date: Nov 2008
Posts: 3,185
|
was up to 2 am last night finishing the prep, priming and painting (with H) the master bed and master closet. H took these pics with her iphone (crappy) , and got the now-too-warm-toned flouresents blaring in the shot. i adjusted that pic a little bit to match the first one. i will take better pics later, still need to do the white trim, but that is after we are done with the rest of the painting.
still working on the archways with joint compound - hopefully just one more coat (i was going to add water for the last coat and mix it. any one done this ? ) still need to get the rest of the paint and primer, but total so far: $1092.85
__________________
Quote:
|
|
Bookmarks |
Thread Tools | |
Display Modes | |
|
|